CocoaCraft training • interactive lesson
NCR approval and lot release
Learn the decisions behind a nonconformance, not just where to click. Follow seven steps, answer a quick check at each stage, and use the linked fictional NCR record to see how the details fit together.
Fictional case: Sierra Verde Cooperative · 420 kg · moisture 8.7% versus 8.0% maximum
Training only. The sample contains simulated suppliers, checks and approvals. It does not modify real supplier records, NCRs or shipment permissions. Real NCR workspace →
Step 1 of 7 · Buyer quality
Recognize the inspection failure
What to do
Compare 8.7% measured moisture with the 8.0% maximum. Record the affected lot and open its NCR.
Why it matters
The supplier's monthly score does not override a failed lot-level acceptance criterion.
